Compliance

Specified for inspection from day one

Local health and fire departments make the final call. We design to their checklists and hand you the paperwork they ask for.

AreaWhat we specifyWho signs off
Food equipmentNSF/ANSI 2, 4 and 7 listed equipment and sinks; handwash and 3-compartment sinks; fresh and grey tanks sized to codeLocal health department
Appliances & wiringUL, ETL or CSA-listed appliances; 120/240 V panel; wiring to the NECLocal inspector
Hood & suppressionType I hood; UL 300 system installed and tagged by an authorized US distributorFire marshal; system inspected every 6 months
LP gasNFPA 58 layout, shutoff and piping; DOT cylinders sourced in the USThird-party LP certification
RoadBuilt to FMVSS 108 lighting and labeling requirements; VIN and certification label, certificate of origin for titleCertification label on the trailer; state title office issues the title

See where each system sits on the ARC 16 ↓

Plan-review package

Floor plan, equipment schedule with listing numbers, plumbing and electrical diagrams, and water and grey-tank calculations, prepared for one county’s health and fire review. Available on any model for $1,900.

Built for Michigan first

Our base is Novi, in Oakland County. We design around Michigan’s Transitory Food Unit rules and local fire checklists, and adapt the package for each new market.

Read the Michigan approval guide →

What we do not claim. No federal agency rates or certifies food trailers. We do not say a unit is “approved” or “certified” by a government body. We specify to the listed standards above and support your submittal; approval is given by the authority where you operate.
System by system

Inside the ARC 16

Where each regulated system sits on our flagship trailer, what we specify it to, and who signs it off.

  1. The ARC 16 concept model, closed, seen from the curbside.
    Concept model · subject to final engineering
    01 · Inside the ARC 16

    Six systems, six sign-offs

    Scroll to take the roof and the curbside skin off our flagship trailer. Each system that an inspector looks at lights up in turn, with what we specify it to and who signs it off where you operate.

  2. The concept model with the roof lifted and the curbside skin moved away, showing the hot line on the street side, the service counter on the curbside and the sinks at the front wall.
    Concept model · subject to final engineering
    02 · The layout

    A single-sided kitchen

    The hot line runs along the street-side wall, the service counter faces the curb and the sinks sit across the front wall. Stainless behind the hot line and under the hood, FRP on the other walls, and a non-slip floor with coved corners.

    What we specify
    Floor plan, equipment schedule and finishes, drawn up for plan review
    Who signs off
    Your health department, at plan review before the build starts
  3. The hood, suppression nozzles, agent tank, pull station and roof exhaust fan highlighted in amber.
    Concept model · subject to final engineering
    03 · Hood & suppression

    Type I hood with UL 300 suppression

    One 8 ft hood covers the whole cooking line. The suppression system sits with it: a nozzle over each appliance, the agent tank and a manual pull station by the exit.

    What we specify
    Type I hood with listed grease filters and roof exhaust fan; UL 300 system installed and tagged by an authorized US distributor
    Who signs off
    Fire marshal where you operate; the system is inspected every 6 months
  4. The griddle, burners, fryers, chef base, reach-in fridge, freezer, prep rail and hot holding highlighted in amber.
    Concept model · subject to final engineering
    04 · Cooking line

    Listed equipment, end to end

    Shown with the Full hot line package: 36″ griddle and 2-burner over a 48″ refrigerated chef base, two 40 lb fryers, reach-in fridge, freezer and 2-well hot holding. The other packages use the same platform.

    What we specify
    UL, ETL or CSA-listed appliances; food equipment listed to NSF/ANSI 4 (cooking, hot holding) and NSF/ANSI 7 (refrigeration)
    Who signs off
    Local health department for the equipment schedule; local inspector for the connections
  5. The two sinks, fresh and grey tanks and water heater highlighted in amber, seen from the rear of the trailer.
    Concept model · subject to final engineering
    05 · Water

    Sinks, tanks and hot water

    A handwash sink and a 3-compartment sink across the front wall, with the fresh and grey tanks and the electric water heater under the counter.

    What we specify
    NSF/ANSI 2 sinks; UL 174 water heater; pump, tanks and lines that touch drinking water to NSF/ANSI 61; tanks sized to code, 40 gal fresh and 48 gal grey in the current design
    Who signs off
    Local health department
  6. The front compartment opened to show two LP cylinders, the regulator, the shutoff and the gas line to the appliances, highlighted in amber.
    Concept model · subject to final engineering
    06 · LP gas

    Gas stays outside the kitchen

    Two cylinders ride in the front compartment on the tongue. From the regulator, one line runs through a quarter-turn emergency shutoff and in along the back of the hot line to each appliance.

    What we specify
    NFPA 58 layout, shutoff and piping; two 100 lb DOT 4BA/4BW cylinders sourced in the US
    Who signs off
    Third-party LP certification, then your local fire inspection
  7. The electrical panel, transfer switch, shore-power inlet and optional generator highlighted in amber.
    Concept model · subject to final engineering
    07 · Electrical

    Shore power or generator

    One panel feeds the line, whether the trailer is plugged in at a venue or running on its own. Option: LP generator, 7–10 kW, in a vented, sound-insulated enclosure with transfer switch.

    What we specify
    UL-listed 120/240 V panel and breakers; 50 A shore-power inlet and generator inlet with transfer switch; GFCI receptacles at the counters; wired to the NEC
    Who signs off
    Local inspector
  8. The closed trailer from the rear curbside corner, with the axles, brakes, breakaway, lamps and VIN label highlighted.
    Concept model · subject to final engineering
    08 · Running gear & lighting

    Back together for the road

    The axles, wheels, A/C and hood fan ship detached and are fitted in Michigan, where the lights and brakes are tested and the trailer is road-tested before delivery.

    What we specify
    Tandem torsion axles, electric brakes on all four wheels, breakaway system, 2-5/16″ coupler; FMVSS 108 lighting with clearance and identification lamps; VIN, certification label and certificate of origin for title
    Who signs off
    Certification label on the trailer; your state title office issues the title

Positions are a concept for the ARC 16 with the Full hot line package and are subject to final engineering. Equipment shown is typical for the package; final makes and models are confirmed in the signed spec. Approval is given by the authority where you operate.

Have a menu and a market in mind?

Tell us how many units you may need and where they will operate. We reply within two business days with a recommended model and a budgetary price.

Send an enquiry