Specified for inspection from day one
Local health and fire departments make the final call. We design to their checklists and hand you the paperwork they ask for.
| Area | What we specify | Who signs off |
|---|---|---|
| Food equipment | NSF/ANSI 2, 4 and 7 listed equipment and sinks; handwash and 3-compartment sinks; fresh and grey tanks sized to code | Local health department |
| Appliances & wiring | UL, ETL or CSA-listed appliances; 120/240 V panel; wiring to the NEC | Local inspector |
| Hood & suppression | Type I hood; UL 300 system installed and tagged by an authorized US distributor | Fire marshal; system inspected every 6 months |
| LP gas | NFPA 58 layout, shutoff and piping; DOT cylinders sourced in the US | Third-party LP certification |
| Road | Built to FMVSS 108 lighting and labeling requirements; VIN and certification label, certificate of origin for title | Certification label on the trailer; state title office issues the title |
See where each system sits on the ARC 16 ↓
Plan-review package
Floor plan, equipment schedule with listing numbers, plumbing and electrical diagrams, and water and grey-tank calculations, prepared for one county’s health and fire review. Available on any model for $1,900.
Built for Michigan first
Our base is Novi, in Oakland County. We design around Michigan’s Transitory Food Unit rules and local fire checklists, and adapt the package for each new market.
Inside the ARC 16
Where each regulated system sits on our flagship trailer, what we specify it to, and who signs it off.

Concept model · subject to final engineering 01 · Inside the ARC 16Six systems, six sign-offs
Scroll to take the roof and the curbside skin off our flagship trailer. Each system that an inspector looks at lights up in turn, with what we specify it to and who signs it off where you operate.

Concept model · subject to final engineering 02 · The layoutA single-sided kitchen
The hot line runs along the street-side wall, the service counter faces the curb and the sinks sit across the front wall. Stainless behind the hot line and under the hood, FRP on the other walls, and a non-slip floor with coved corners.
- What we specify
- Floor plan, equipment schedule and finishes, drawn up for plan review
- Who signs off
- Your health department, at plan review before the build starts

Concept model · subject to final engineering 03 · Hood & suppressionType I hood with UL 300 suppression
One 8 ft hood covers the whole cooking line. The suppression system sits with it: a nozzle over each appliance, the agent tank and a manual pull station by the exit.
- What we specify
- Type I hood with listed grease filters and roof exhaust fan; UL 300 system installed and tagged by an authorized US distributor
- Who signs off
- Fire marshal where you operate; the system is inspected every 6 months

Concept model · subject to final engineering 04 · Cooking lineListed equipment, end to end
Shown with the Full hot line package: 36″ griddle and 2-burner over a 48″ refrigerated chef base, two 40 lb fryers, reach-in fridge, freezer and 2-well hot holding. The other packages use the same platform.
- What we specify
- UL, ETL or CSA-listed appliances; food equipment listed to NSF/ANSI 4 (cooking, hot holding) and NSF/ANSI 7 (refrigeration)
- Who signs off
- Local health department for the equipment schedule; local inspector for the connections

Concept model · subject to final engineering 05 · WaterSinks, tanks and hot water
A handwash sink and a 3-compartment sink across the front wall, with the fresh and grey tanks and the electric water heater under the counter.
- What we specify
- NSF/ANSI 2 sinks; UL 174 water heater; pump, tanks and lines that touch drinking water to NSF/ANSI 61; tanks sized to code, 40 gal fresh and 48 gal grey in the current design
- Who signs off
- Local health department

Concept model · subject to final engineering 06 · LP gasGas stays outside the kitchen
Two cylinders ride in the front compartment on the tongue. From the regulator, one line runs through a quarter-turn emergency shutoff and in along the back of the hot line to each appliance.
- What we specify
- NFPA 58 layout, shutoff and piping; two 100 lb DOT 4BA/4BW cylinders sourced in the US
- Who signs off
- Third-party LP certification, then your local fire inspection

Concept model · subject to final engineering 07 · ElectricalShore power or generator
One panel feeds the line, whether the trailer is plugged in at a venue or running on its own. Option: LP generator, 7–10 kW, in a vented, sound-insulated enclosure with transfer switch.
- What we specify
- UL-listed 120/240 V panel and breakers; 50 A shore-power inlet and generator inlet with transfer switch; GFCI receptacles at the counters; wired to the NEC
- Who signs off
- Local inspector

Concept model · subject to final engineering 08 · Running gear & lightingBack together for the road
The axles, wheels, A/C and hood fan ship detached and are fitted in Michigan, where the lights and brakes are tested and the trailer is road-tested before delivery.
- What we specify
- Tandem torsion axles, electric brakes on all four wheels, breakaway system, 2-5/16″ coupler; FMVSS 108 lighting with clearance and identification lamps; VIN, certification label and certificate of origin for title
- Who signs off
- Certification label on the trailer; your state title office issues the title
Positions are a concept for the ARC 16 with the Full hot line package and are subject to final engineering. Equipment shown is typical for the package; final makes and models are confirmed in the signed spec. Approval is given by the authority where you operate.